HomeMy WebLinkAbout3F. Engineering Services Agreement Amendments3F. .aOrif. Fbault Request for Council Action TO: Mayor and City Council THROUGH: Michael A. McGuire, Interim City Administrator FROM: Tim Murray, City Engineer MEETING DATE: January 8, 2013 SUBJECT: Approve Engineering Services Agreement Amendments for Downtown Area Improvements - Phase 3 and Division Street Bridge Replacement Projects Background: The City is utilizing engineering consulting firms for two improvement projects, the Downtown Area Improvements - Phase 3 (I &S Group) and the Division Street Bridge Replacement Projects (Bolton & Menk). Changes to the scope and /or schedules for both of these projects warrants amendments to the engineering services agreements, to reflect the additional efforts required to complete the work. For the Downtown Area Improvements - Phase 3 project, the construction was originally planned for 2012. Due to delays in layout approval from MnDOT, delivery for construction in 2012 was not feasible, so construction was moved to 2013. In addition, the outside funding on this project changed from a combination of federal aid and municipal state aid, to all municipal state aid. All of these items required plan and specification revisions. The increase in fees for these changes is $8,000.00, increasing the total fee from $84,000.00 to $92,000.00 The Division Street Bridge Replacement project was originally intended to have the same faux railing components as are in place on the Old 4th Street box culverts, and that is what was completed in the final construction plans. Per direction from the City Council, the railings were changed to be an alternate, with chain link fencing to be included in the base bid. This required the revision of plan sheets and other bid documents. In addition, an alternate bid to directionally drill the watermain was added to the project, again requiring plan sheet and specification revisions. Finally, the time required to get these items completed made material delivery for 2012 problematic, so further revisions were made to push the construction schedule in to 2013. The increase in fees for these changes is $7,471.50, increasing the total fee from $38,550.00 to $46,021.50. Recommendation: Accept Engineering Services Agreement Amendments for: Contract 2012 -06 - I & S Group, Inc. Contract 2012 -08 - Bolton & Menk, Inc. Council Action: Administrative Comments: I ' L' J One firm - start to finish- December 11, 2012 Tim Murray City Engineer / Public Works Director City of Faribault 1200 Belview Trail Faribault, MN 55021 www.is- grp.com Mankato, MN Faribault, MN Storm Lake, IA Algona, IA Sac City, IA La Crosse, WI ARCHITECTS • ENGINEERS - PLANNERS • LAND SURVEYORS - SCIENTISTS RE: TH 60 /Downtown Reconstruction — Phase 3 Supplemental Services Proposal — Faribault, Minnesota Dea r Ti m: Thank you for the opportunity to submit a proposal for additional compensation for project delays that have occurred as the TH60 Downtown project has progressed. I &S has appreciated the opportunity to assist the City of Faribault with the professional design services for the Trunk Highway 60 /Downtown Reconstruction Phase 3 project. Unfortunately, due to forces outside of our control, the project schedule has been extended beyond what was initially outlined for the project. The initial project RFP and subsequent proposal and contract for the project outlined a construction schedule for the 2012 construction season which was not met for the project due to unforeseen delays on the part of MnDOT. Due to these delays, the construction schedule for the project has been extended such that the construction is to occur during the 2013 construction season. This delay has caused an increased scope of work to be added to the project in order to update the plans and specifications to meet the new construction schedule. As a result of the added scope of work and overall timeframe of the project, additional resources, time, and materials will need to be devoted to this project beyond those included in the original project contract. As such I &S requests supplemental compensation in the amount of $8,000 to cover our expenses associated with the additional labor and materials provided and keep this project moving forward. Thank you again for the opportunity to submit this proposal and continue working with you on this project. Please feel free to contact me with any questions regarding our services or this proposal. We look forward to finalizing the design for this project and seeing it move into the construction phase in 2013. Sincerely, Andrew T. Brandel, PE Civil Engineer ATB /sam k t � § k « 2 @ ; q � } \ \ \ \ § Lo ) _ } \ \ \ \ < . \ 2 ) } 0 . § Lj § / ) k k \ . : e .