Loading...
HomeMy WebLinkAbout3D. Res. 2013-003 Initiate Project 2013 Street Reconstruction3D. Request for Council Action TO: Mayor and City Council THROUGH:Michael A. McGuire, Interim City Administrator FROM: Tim Murray, City Engineer MEETING DATE: January 8, 2013 SUBJECT:Resolution 2013-003 Initiate Project and Order Feasibility Report for 2013 Street Reconstruction Improvements - Contract 2013-04 Background: Attached is a routine resolution initiating a project and ordering a feasibility report for the 2013 Street Reconstruction Improvements project, including removals, grading, aggregate base, concrete curb and gutter, bituminous surfacing, sanitary sewer and services, watermain and services, storm sewer, concrete sidewalk, and related improvements. The streets proposed to be included in this project are as follows: Bradley Road - T.H. 21 to Hulett Ave. Cardinal Avenue - Bethel Ct. to Woodland Dr. th 13 Street N.E. - Central Ave. to east end thndrd 14 Street N.W. - 2 Ave. N.W. to 3 Ave. N.W. This improvement project is included in the adopted 2013 Budget and Capital Improvement Plan. Staff anticipates following the standard improvement process. A feasibility report will be filed with Council, staff will conduct a public informational meeting, and a public hearing for consideration of the improvements will follow with City Council. Recommendation: Approve Resolution 2013-003 Council Action: Administrative Comments: State of Minnesota County of Rice CITY OF FARIBAULT RESOLUTION#2013-003 IPOFR2013S NITIATE ROJECT AND RDER EASIBILITY EPORT FOR TREET RIÏC2013-04 ECONSTRUCTION MPROVEMENTS ONTRACT WHEREAS, it is proposed to improve the following streets as part of the 2013 Street Reconstruction Improvements project by removals, grading, aggregate base, concrete curb and gutter, bituminous surfacing, sanitary sewer and services, watermain and services, storm sewer, concrete sidewalk, and related improvements and to assess the benefited property for all or a portion of the cost of the improvements, pursuant to Minnesota S Chapter 429: Bradley Road - T.H. 21 to Hulett Ave. Cardinal Avenue - Bethel Ct. to Woodland Dr. 13 Street N.E. - Central Ave. to east end th 14 Street N.W. - 2 Ave. N.W. to 3 Ave. N.W. thndrd NOW, THEREFORE BE IT RESOLVED, that the proposed improvements be referred to the City staff and they are instructed to report back to the Council with all convenient speed advising the Council in a preliminary way as to whether the proposed improvements are feasible and as to whether they should best be made as proposed or in connection with some other improvements, and to determine the estimated cost of the improve Date Adopted: January 8, 2013 Faribault City Council _________________________________ John R. Jasinski, Mayor ATTEST: __________________________________________ Michael A. McGuire, Interim City Administrator WN EVA DR3 WN EVA NLOCNIL EVA NILKNARF