HomeMy WebLinkAbout3C. Res. 2013-002 Initiate Project 2013 Overlays and Sidewalks3C.
Request for Council Action
TO: Mayor and City Council
THROUGH:Michael A. McGuire, Interim City Administrator
FROM: Tim Murray, City Engineer
MEETING DATE: January 8, 2013
SUBJECT:Resolution 2013-002 Initiate Project and Order
Feasibility Report for 2013 Street Overlay and
Sidewalk Improvements - Contract 2013-03
Background:
Attached is a routine resolution initiating a project and ordering
a feasibility report for the 2013 Street Overlay and Sidewalk
Improvements project, including concrete curb and gutter
replacement, concrete sidewalk construction/replacement, storm
sewer, drain tile, casting adjustment and replacement, pavement
milling/reclamation, bituminous paving, and related improvements.
The streets proposed to be included in this project are as follows:
Airtech Drive - Airport Drive to 750 feet northwest
th
Autumn Drive - Spring Rd. to 12 St. S.W.
th
Conliffe Avenue - Prairie Ave. to 5 St. S.W.
th
Park Avenue N.W. - T.H. 60 to 7 St. N.W.
thth
Spring Road - CSAH 18/9 Ave. S.W. to 12 St. S.W.
Springwood Lane - Prairie Ave. to Westwood Dr.
Summer Lane - Spring Rd. to Winter Dr.
Winter Drive - Autumn Dr. to Spring Rd.
Trailwood Lane - Prairie Ave. to Westwood Dr.
Westwood Drive - Windsor Pl. to Springwood Ln.
Windsor Place - Greenwood Pl. to Westwood Dr.
stthth
Avenue N.W. - 13 St. N.W. to 14 St. N.W.
1
rdrd
3 Avenue N.W. - Division St. to 3 St. N.W.
th
4 Street S.W. - Faribault Rd. to Conliffe Ave.
thndth
5 Street N.W. - 2 Ave. N.W. to 8 Ave. N.W.
th
5 Street S.W. - Faribault Rd. to Conliffe Ave.
th
6 Street N.W. - Park Ave. N.W. to west end
ththth
12 Street S.W. - CSAH 18/9 Ave. S.W. to 6 Ave. S.W.
ththnd
16 Street N.W. - 18 Ave. N.W. to 22 Ave. N.W.
ththth
18 Avenue N.W. - 16 St. N.W. to 17 St. N.W.
thnd
19 Avenue N.W. - 2 St. N.W. to Grant St. S.
th
19 Street S.W. - Prairie Ave. to Westwood Dr.
ththth
Avenue N.W. - 16 St. N.W. to 17 St. N.W.
20
ndthth
22 Avenue N.W. - 15 St. N.W. to 16 St. N.W.
th
30 Avenue N.W. – T.H. 60 to north end
Staff anticipates following the standard improvement process. A
feasibility report will be filed with Council, staff will conduct a public
informational meeting, and a public hearing for consideration of the
improvements will follow with City Council.
Recommendation:
Approve Resolution 2013-002
Council Action:
Administrative Comments:
State of Minnesota
County of Rice
CITY OF FARIBAULT
RESOLUTION#2013-002
IPOFR2013S
NITIATE ROJECT AND RDER EASIBILITY EPORT FOR TREET
OSIÏC2013-03
VERLAY AND IDEWALK MPROVEMENTS ONTRACT
WHEREAS, it is proposed to improve the following streets as part of the
2013 Street Overlay and Sidewalk Improvements project by concrete curb
and gutter replacement, concrete sidewalk construction/replacement, storm
sewer, drain tile, casting adjustment and replacement, pavement
milling/reclamation, bituminous paving, and related improvements and to
assess the benefited property for all or a portion of the cost of the
improvements, pursuant to Minnesota Statutes, Chapter 429:
Airtech Drive - Airport Drive to 750 feet northwest
Autumn Drive - Spring Rd. to 12 St. S.W.
th
Conliffe Avenue - Prairie Ave. to 5 St. S.W.
th
Park Avenue N.W. - T.H. 60 to 7 St. N.W.
th
Spring Road - CSAH 18/9 Ave. S.W. to 12 St. S.W.
thth
Springwood Lane - Prairie Ave. to Westwood Dr.
Summer Lane - Spring Rd. to Winter Dr.
Winter Drive - Autumn Dr. to Spring Rd.
Trailwood Lane - Prairie Ave. to Westwood Dr.
Westwood Drive - Windsor Pl. to Springwood Ln.
Windsor Place - Greenwood Pl. to Westwood Dr.
1 Avenue N.W. - 13 St. N.W. to 14 St. N.W.
stthth
3 Avenue N.W. - Division St. to 3 St. N.W.
rdrd
4 Street S.W. - Faribault Rd. to Conliffe Ave.
th
5 Street N.W. - 2 Ave. N.W. to 8 Ave. N.W.
thndth
5 Street S.W. - Faribault Rd. to Conliffe Ave.
th
6 Street N.W. - Park Ave. N.W. to west end
th
12 Street S.W. - CSAH 18/9 Ave. S.W. to 6 Ave. S.W.
ththth
16 Street N.W. - 18 Ave. N.W. to 22 Ave. N.W.
ththnd
18 Avenue N.W. - 16 St. N.W. to 17 St. N.W.
ththth
19 Avenue N.W. - 2 St. N.W. to Grant St. S.
thnd
19 Street S.W. - Prairie Ave. to Westwood Dr.
th
20 Avenue N.W. - 16 St. N.W. to 17 St. N.W.
ththth
22 Avenue N.W. - 15 St. N.W. to 16 St. N.W.
ndthth
30 Avenue N.W. - T.H. 60 to north end
th
NOW, THEREFORE BE IT RESOLVED, that the proposed improvements
be referred to the City staff and they are instructed to report back to the
Council with all convenient speed advising the Council in a preliminary way
as to whether the proposed improvements are feasible and as to whether they
should best be made as proposed or in connection with some other
improvements, and to determine the estimated cost of the improve
Date Adopted: January 8, 2013
Faribault City Council
_________________________________
John R. Jasinski, Mayor
ATTEST:
__________________________________________
Michael A. McGuire, Interim City Administrator
21
Overlay
- Airtech Drive
32ND ST NW
Sidewalk
- Cardinal Avenue
Overlay
- 1st Avenue NW
3
Overlay
- 16th Street NW
- 18th Avenue NW
- 20th Avenue NW
21
- 22nd Avenue NW
Overlay
- 5th Street NW
MATTESON ST
MAPLE LN
Overlay And
Sidewalk
- 6th Street NW
- Park Avenue
¬
«
11299
Overlay
- 30th Avenue NW
60
DIVISION ST W
4TH ST SW
60
Overlay
Overlay
- 19th Avenue NW
¬
«
- 3rd Avenue NW
93
Overlay
- Conliffie Avenue
10TH ST SW
Sidewalk
- 4th Street NW
§
¨¦
35
- 12th Street NW
- 5th Street NW
¬
«
48
Overlay
- Springwood Lane
- Trailwood Lane
- Westwood Drive
- Windsor Place
Overlay
¬
«
47
- 12th Street NW
- Autumn Drive
¬
«
19
- Spring Road
Overlay
¬
«
- Summer Lane
- 19th Street NW
18
- Winter Drive
µ
City of Faribault:
Contract 2013-03
OVERLAY
2013 Street Overlays and Sidewalks
SIDEWALK REPAIR
January 2013