Loading...
HomeMy WebLinkAbout3C. Res. 2013-002 Initiate Project 2013 Overlays and Sidewalks3C. Request for Council Action TO: Mayor and City Council THROUGH:Michael A. McGuire, Interim City Administrator FROM: Tim Murray, City Engineer MEETING DATE: January 8, 2013 SUBJECT:Resolution 2013-002 Initiate Project and Order Feasibility Report for 2013 Street Overlay and Sidewalk Improvements - Contract 2013-03 Background: Attached is a routine resolution initiating a project and ordering a feasibility report for the 2013 Street Overlay and Sidewalk Improvements project, including concrete curb and gutter replacement, concrete sidewalk construction/replacement, storm sewer, drain tile, casting adjustment and replacement, pavement milling/reclamation, bituminous paving, and related improvements. The streets proposed to be included in this project are as follows: Airtech Drive - Airport Drive to 750 feet northwest th Autumn Drive - Spring Rd. to 12 St. S.W. th Conliffe Avenue - Prairie Ave. to 5 St. S.W. th Park Avenue N.W. - T.H. 60 to 7 St. N.W. thth Spring Road - CSAH 18/9 Ave. S.W. to 12 St. S.W. Springwood Lane - Prairie Ave. to Westwood Dr. Summer Lane - Spring Rd. to Winter Dr. Winter Drive - Autumn Dr. to Spring Rd. Trailwood Lane - Prairie Ave. to Westwood Dr. Westwood Drive - Windsor Pl. to Springwood Ln. Windsor Place - Greenwood Pl. to Westwood Dr. stthth Avenue N.W. - 13 St. N.W. to 14 St. N.W. 1 rdrd 3 Avenue N.W. - Division St. to 3 St. N.W. th 4 Street S.W. - Faribault Rd. to Conliffe Ave. thndth 5 Street N.W. - 2 Ave. N.W. to 8 Ave. N.W. th 5 Street S.W. - Faribault Rd. to Conliffe Ave. th 6 Street N.W. - Park Ave. N.W. to west end ththth 12 Street S.W. - CSAH 18/9 Ave. S.W. to 6 Ave. S.W. ththnd 16 Street N.W. - 18 Ave. N.W. to 22 Ave. N.W. ththth 18 Avenue N.W. - 16 St. N.W. to 17 St. N.W. thnd 19 Avenue N.W. - 2 St. N.W. to Grant St. S. th 19 Street S.W. - Prairie Ave. to Westwood Dr. ththth Avenue N.W. - 16 St. N.W. to 17 St. N.W. 20 ndthth 22 Avenue N.W. - 15 St. N.W. to 16 St. N.W. th 30 Avenue N.W. – T.H. 60 to north end Staff anticipates following the standard improvement process. A feasibility report will be filed with Council, staff will conduct a public informational meeting, and a public hearing for consideration of the improvements will follow with City Council. Recommendation: Approve Resolution 2013-002 Council Action: Administrative Comments: State of Minnesota County of Rice CITY OF FARIBAULT RESOLUTION#2013-002 IPOFR2013S NITIATE ROJECT AND RDER EASIBILITY EPORT FOR TREET OSIÏC2013-03 VERLAY AND IDEWALK MPROVEMENTS ONTRACT WHEREAS, it is proposed to improve the following streets as part of the 2013 Street Overlay and Sidewalk Improvements project by concrete curb and gutter replacement, concrete sidewalk construction/replacement, storm sewer, drain tile, casting adjustment and replacement, pavement milling/reclamation, bituminous paving, and related improvements and to assess the benefited property for all or a portion of the cost of the improvements, pursuant to Minnesota Statutes, Chapter 429: Airtech Drive - Airport Drive to 750 feet northwest Autumn Drive - Spring Rd. to 12 St. S.W. th Conliffe Avenue - Prairie Ave. to 5 St. S.W. th Park Avenue N.W. - T.H. 60 to 7 St. N.W. th Spring Road - CSAH 18/9 Ave. S.W. to 12 St. S.W. thth Springwood Lane - Prairie Ave. to Westwood Dr. Summer Lane - Spring Rd. to Winter Dr. Winter Drive - Autumn Dr. to Spring Rd. Trailwood Lane - Prairie Ave. to Westwood Dr. Westwood Drive - Windsor Pl. to Springwood Ln. Windsor Place - Greenwood Pl. to Westwood Dr. 1 Avenue N.W. - 13 St. N.W. to 14 St. N.W. stthth 3 Avenue N.W. - Division St. to 3 St. N.W. rdrd 4 Street S.W. - Faribault Rd. to Conliffe Ave. th 5 Street N.W. - 2 Ave. N.W. to 8 Ave. N.W. thndth 5 Street S.W. - Faribault Rd. to Conliffe Ave. th 6 Street N.W. - Park Ave. N.W. to west end th 12 Street S.W. - CSAH 18/9 Ave. S.W. to 6 Ave. S.W. ththth 16 Street N.W. - 18 Ave. N.W. to 22 Ave. N.W. ththnd 18 Avenue N.W. - 16 St. N.W. to 17 St. N.W. ththth 19 Avenue N.W. - 2 St. N.W. to Grant St. S. thnd 19 Street S.W. - Prairie Ave. to Westwood Dr. th 20 Avenue N.W. - 16 St. N.W. to 17 St. N.W. ththth 22 Avenue N.W. - 15 St. N.W. to 16 St. N.W. ndthth 30 Avenue N.W. - T.H. 60 to north end th NOW, THEREFORE BE IT RESOLVED, that the proposed improvements be referred to the City staff and they are instructed to report back to the Council with all convenient speed advising the Council in a preliminary way as to whether the proposed improvements are feasible and as to whether they should best be made as proposed or in connection with some other improvements, and to determine the estimated cost of the improve Date Adopted: January 8, 2013 Faribault City Council _________________________________ John R. Jasinski, Mayor ATTEST: __________________________________________ Michael A. McGuire, Interim City Administrator 21 Overlay - Airtech Drive 32ND ST NW Sidewalk - Cardinal Avenue Overlay - 1st Avenue NW 3 Overlay - 16th Street NW - 18th Avenue NW - 20th Avenue NW 21 - 22nd Avenue NW Overlay - 5th Street NW MATTESON ST MAPLE LN Overlay And Sidewalk - 6th Street NW - Park Avenue ¬ « 11299 Overlay - 30th Avenue NW 60 DIVISION ST W 4TH ST SW 60 Overlay Overlay - 19th Avenue NW ¬ « - 3rd Avenue NW 93 Overlay - Conliffie Avenue 10TH ST SW Sidewalk - 4th Street NW § ¨¦ 35 - 12th Street NW - 5th Street NW ¬ « 48 Overlay - Springwood Lane - Trailwood Lane - Westwood Drive - Windsor Place Overlay ¬ « 47 - 12th Street NW - Autumn Drive ¬ « 19 - Spring Road Overlay ¬ « - Summer Lane - 19th Street NW 18 - Winter Drive µ City of Faribault: Contract 2013-03 OVERLAY 2013 Street Overlays and Sidewalks SIDEWALK REPAIR January 2013