Loading...
HomeMy WebLinkAbout7B. Quotes for Restroom Repairs at North Alexander Parkcity f. Fan ault Request for Council Action TO: Mayor and City Council THROUGH: Chuck Whiting, City Administrator FROM: Paul J. Peanasky, Buckham Center Director MEETING DATE: May 10, 2011 SUBJECT: Approve restroom repairs at N. Alexander Park Background: In June of 2010 the restrooms at North Alexander Park were severely vandalized. Due to staffing shortages we were not able to determine what would be needed and get quotes until now. We are looking at adding automatic door closures so the facility will automatically be locked at night. We are also adding stainless steel fixtures with automatic flushers and a vent system to move the air as well as new lighting. We were originally looking to put a new surface on the floor but found out during the process that a new cement floor was cheaper then repairing and adding a new surface. Low proposal with all alternates is from Healy Construction of Faribault for $43,500.00. Since this was a vandalism damage project the repairs will be paid mostly from the City insurance account with the door replacement coming from the Parks general maintenance budget. Recommendation: Approve restroom repairs at North Alexander Park in amount of $43,500.00 by Healy Construction. Attachments: Proposals NEM DRUM CO. May 5, 2011 Attn: Keith, 507 - 384 -0563 GENERAL CONSTRUCTION Phone: (507) 332 -7479 Box 697, 630 S.W. Fourth Avenue FAX (507) 332 -6931 FARIBAULT, MINNESOTA 55021 RE: North Alexander Restrooms- Revised • New toilets and urinals with auto -flush valves • New sinks with auto - faucets • New water heater • New handicap accessible HDPE toilet partitions • New lighting with occupancy sensors • New doors with electric locks on timer • New gable exhaust sy stem For the.sum of ----- -----­ $28,900.00 Alternate #1 Remove and replace concrete floors #2 Stainless fixtures Add - --- T ---------- -- -- --$4,600.00 Add -------- - .. ------------ $8,100.00 #3 .Re -pipe underground.plumbing Respectfully .Submitted, Add ---- --- ---------------- $1,900.00 J. William Healy I F I Luiken Construction STATE MN We hereby submit specifications and estimate for: SEE ATTACHMENT We hereby propose to furnish labor and materials - complete in accordance with the above specifications, for the sum of Forty Nine Thousand Four Hundred Sixty dollars ( 49460.00 ) with payment to be made as follows: Monthly draws All material is guaranteed to be as specified, All work to be completed in a workmanlike manner according to standard practices, Any alteration or deviation from above specifications involving extra costs, will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accident or delays beyond our coil This pr osal subject to acceptance withhi _30_ days and it is void thereafter at the option of the undersigned. ® � Authorized Signature The above prices, specifications and conditions are hereby accepted. as outlined above. ACCEPTED: I DATE are authorized to do the work as specified. Payment will be made Signature Signature LUIKEN CONSTRUCTION 226 S.W. 1 st Avenue Faribault, MN 55021 PROPOSAL- ATTACHMENT City of Faribault 208 N.W. 1st Avenue Faribault, MN 55021 Project: North Alexander Park Bathroom Faribault, MN Bathroom remodel to include: Building Permit fee All materials, labor and equipment Demolition of existing toilet partitions and 3 doors and frames Replace 3 hollow metal doors, frames and hardware - (2 - 3'0 "x 68 ", 1 - 2'4 "x 6'8 ") Mens & Womens door hardware to include for each door: 4 1/2" x 4 1/2" hinges US26D, NRP Lockset Electric strikes 10 "x 34" kickplate Closer /stop Threshold Weatherstrip Sweep Storage Room door to include: 4 1/2" x 4 1/2" hinges U826D, NRP Lockset Kickplate Closer /stop Sweep Lock guard Plumbing: Repiping of drain, waste, vent and water piping Fixtures - 3 Metcraft stainless steel toilets 2 Metcraft stainless steel straddle urinals 4 Elkay stainless steel lav sinks 3 - Sloan concealed water closet flush valves w /sensors 4 - Sloan sensored hand wash faucets 1 - E -Max on- demand 240 volt water heater 4 - 24" x 21" stainless steel counter tops with 4" backsplash, angle iron support brackets and stainless steel trap guards 4/29/2011 Electrical Replace existing lighting (2 bathrooms) with 4' vandal proof fixtures and auto sensors Install new ventilation fan and auto sensor, ducted to gable end Wire for all auto flush valves Wire for on- demand 240 volt water heater Wire for auto door lock functions Furnish and install 3 stalls, solid toile partitions Furnish and install handicap grab bars for 2 - handicapped toilet stalls Clean -up and removal of all debris ALTERNATE #1 Replace concrete floors in Men's and Women's bathrooms (12'x 16' ea.) Add: $3,043.00 ALTERNATE #1 -A Remove 6" of existing soil and add back 6" granular fill & compact ALTERNATE #1 -B Apply 1 coat concrete floor sealer ALTERNATE #2 To use porcelain plumbing fixtures in lieu of stainless steel Add: Add: $260.00 Deduct: $9,287.00 Phone; (507) 334 -8946 CONSTRUCTION ANDERKA (License # 2409) 18220 Alvey Trail FARIBAULT, MINNESOTA 55021 May 3, 2011 City of Faribault North Alexander Park Bathrooms We propose to furnish material and labor for the following items: Remove concrete floor in two bathrooms Install 6" gravel, 1 %" Dow foam, 4" 4,000# concrete floor — sealed Three metal frames and doors with hardware Electric strikes on bathroom doors with timers New lighting and exhaust fans Handicap grab bars — one men's and one women's High density polymer —two handicap partitions High density polymer — regular partitions and urinal screens Complete repiping of drain and waste vent and water piping Three Metcraft stainless steel water closets with seats Two Metcraft stainless steel straddle type urinals Four Elkay luster stainless steel lav sinks Three Sloan concealed water closet flush valves with sensors Two Sloan concealed urinal flush valves with sensors Four Sloan sensored hand wash faucets Material and labor: $45,064.00 Alternate for porcelain option on bathroom fixtures — deduct: $8,075.00 Orland Anderka, Anderka Construction LIGHT COMMERCIAL • NEW HOMES e REMODELING ® PLANNING SERVICE • CEMENT WORK